from the bench of sabominator
the view for about 20 minutes when i should have been eating lunch:
-rinse and develop membrane 038_1
-incubate membrane 037_3 in multiblotter for primaries, 8 different antibodies
-permeabilize membrane 037_4 in PBS
-nutate blocker for membrane 037_4
-watch the 5 gels running in 3 gel tanks, attempt to finish run simultaneousy; 1 tank is leaking, so use 2 power supplies at different voltages (at opposite ends of the lab)
-set up tanks for transferring the four 2D gels
-equilibrate membranes, filter paper and fiber pads in transfer buffer
-oops, make more transfer buffer
-oops, make more TBS-T for washing membranes
-oops, make more fixer for remaining gel to be silver stained
-make more buffer for FPLC mobile phase
-order another chemiluminescence kit, more film
-weigh out reagents for tomorrow's 043_1 crosslinking/size exclusion chromotography experiment
-prepare the lab for safety inspection tomorrow
-"hey sabrina, are you coming to your boss' seminar in 10 minutes?"
-"no."
*brief reprieve: 7 minute lunch, chinese truck*
wash; rinse; repeat for the next 3 hours...
boss comes by..."hey, how are things going?"
"busy."
"oh. well have you gotten anything done?"
"um, yes."
"on the poster i mean."
"err...i haven't really had time...that collecting data stuff is a real killer."
"oh. ok. well, have a draft by next wednesday."
sure dude, sure.
T MINUS 14 WORK DAYS AND COUNTING UNTIL DEPARTURE FOR NEUROSCIENCE.



0 Comments:
Post a Comment
<< Home